Skip to main content (Press Enter).
U.S. Air Force Logo
Home
About Us
Units
History
Leadership
Fact Sheets
Media
News
Features
Commentaries
Team Rescue Newsletter Archives
Resources
Airman & Family Readiness
Chaplain
Employment
Environmental Safety
Freedom of Information Act
ID Card Office
Personal Financial Counselor
Sexual Assault and Response
Contact Us
FAQs
106th Rescue Wing
Contact Us
DVIDSVideoPlayer
Playlist:
Search Results
Video by Michel Sauret
Player Embed Code:
Share
Embed
Download
B-Roll: Pittsburgh District completes first demolition on historic Monongahela River dam
U.S. Army Corps of Engineers Pittsburgh District
July 10, 2024 | 1:13
B-Roll footage of first demolition from multiple camera angles.
The U.S. Army Corps of Engineers Pittsburgh District performs a controlled explosion to breach the fixed-crest dam at the Monongahela River Locks and Dam 3 near Elizabeth, Pennsylvania, July 10, 2024.
Removing the dam will create a continuous pool of riverway stretching 30 miles from Charleroi to Braddock, Pennsylvania, improving navigation on the Lower Monongahela River.
The dam’s removal work will continue through December. Until the Corps removes the entire dam and verifies the navigation channel is safe, all traffic must pass through the landside lock. After the initial demolition, contractors will perform additional demolitions once per week, requiring the locks to close for three hours or less.
The demolition will require 13 more controlled explosions, taking down the rest of the dam in 50-foot sections. The contractor will use excavators on barges to remove the rubble from the river.
After the dam is removed and the riverway is cleared, waterway users can navigate through the area without using the lock chambers. The river is anticipated to reopen by the end of 2024.
The Pittsburgh District will then move onto the next phase of removing the lock walls in 2025, with work expected to last until 2027.
The demolition is part of the Lower Monongahela River Project. Once complete, the project is expected to bring an economic benefit of $200 million annually, including cost-time savings in transporting commodities through the region using inland navigation and reduced maintenance costs.
The Monongahela River Locks and Dam 3 has been operating since 1907, but the facility is prone to flooding and shuts down operations during high-water events, resulting in navigation delays.
The U.S. Coast Guard supported by establishing a restriction zone 1,500 feet up and downstream of the dam.
(U.S. Army Corps of Engineers Pittsburgh District photo by Michel Sauret / Stacey Wyzykowski / Ian Mckelvey)
More
Tags
demolition
Monongahela
Elizabeth
USACE Pittsburgh District
explosion
More
Up Next
4:38
Walking Tour: Elizabeth Locks Demolition
2:20
Water Resource Management
1:34
B-Roll: Drone footage of John P. Murtha Locks and Dam
5:40
Locks and Dam 3 / Dam Demolition Time-Lapse - USACE Pittsburgh District
11:17
Locks and Dam 3 / Series of Dam Implosions - USACE Pittsburgh District
0:28
John P. Murtha Locks and Dam - Animation
2:54
Pittsburgh District celebrates completion of newest lock chamber on Monongahela River
10:32
A History of the John P. Murtha Locks and Dam
20:32
John P. Murtha Locks and Dam Dedication Ceremony
1:14
Clearing the way for navigation at Elizabeth
6:44
A Final Farewell to a Century of Service (Closed Captioned)
6:44
A Final Farewell to a Century of Service
0:38
Social Reel: A farewell to Lock 3
Now Playing
B-Roll: Pittsburgh District completes first demolition on historic Monongahela River dam
0:34
Timelapse of Monongahela Lock 3, Elizabeth Locks and Dam
More Videos