Skip to main content (Press Enter).
U.S. Air Force Logo
Home
About Us
Units
History
Leadership
Fact Sheets
Media
News
Features
Commentaries
Resources
Airman & Family Readiness
Chaplain
Director of Psychological Health
Employment
Environmental Safety
Freedom of Information Act
ID Card Office
Personal Financial Counselor
Sexual Assault and Response
Contact Us
FAQs
Sexual-Misconduct-Disciplinary-Actions
106th Rescue Wing
Contact Us
DVIDSVideoPlayer
Playlist:
Search Results
Video by Chief Petty Officer Matthew Cole
Player Embed Code:
Download
Embed
Share
McNary Dam
U.S. Army Corps of Engineers Walla Walla District
March 4, 2024 | 0:30
he dam is 7,365 feet long, rising approximately 183 feet above the streambed. It consists of a concrete structure with an earthfill embankment at the Oregon (south) abutment. The spillway is a concrete, gravity-type spillway dam. It is 1,310 feet long, and contains 22 vertical lift gates, each 50 feet by 51 feet. The crest is at elevation 291 feet mean sea level and is designed to pass a flood of 2,200,000 cubic feet per second. U.S. Army Corps of Engineers (USACE) has committed to spill more water over spillways instead of through turbines during its annual “spring spill” operations at dams on the lower Snake and Columbia rivers as well as expanding spill in the fall and early spring.
More
Tags
Army Corps of Engineers
McNary Dam Project
USACE
McNary Dam
More
Up Next
Now Playing
McNary Dam
2:52
McNary Navigation Lock Outage
2:04
Celebrating McNary
0:08
McNary Navigation Lock
0:08
McNary Navigation Lock
6:32
Docks along the shoreline: The intersection of public and private property
1:27
Under Water inspection with Remotely operated Vehicle ROV
1:29
Oregon Army National Guard assists wildfire suppression efforts
6:53
USACE provides fish passage at McNary Lock and Dam
0:11
Spc. Lysa McNary
More Videos